Case Study

Giant Mine Remediation Project — stabilizing 230,000 tonnes of arsenic trioxide underground in the Northwest Territories, Canada.

Client Partners:
Nahanni Construction, JDS, True North Surveys
Timeline:
2015–2024
Lead Engineer:
Bernie Ting
Award:
Project of the Year – Innovative Application, SCA

Overview

Between 2015 and 2024, the T Engineering team participated in one of Canada’s most significant environmental and geotechnical remediation efforts: the Giant Mine Remediation Project. Situated in the Northwest Territories, the site presented a unique and high-stakes challenge - stabilizing underground mine workings housing 230,000 tonnes of arsenic trioxide, a highly toxic byproduct of historical gold mining operations.

The Challenge

The Giant Mine posed an unprecedented risk to both environmental and public safety. Decades of mining had left behind an unstable network of underground voids, which required structural remediation to prevent collapse and potential release of contaminants. A major component of the remediation involved placing engineered backfill materials underground to safely encapsulate and stabilize the arsenic trioxide chambers.

Our Approach

Under the leadership of Bernie Ting, the team spearheaded the backfill component of the project. This involved a multi-year, multi-campaign strategy with a combination of cutting-edge design, adaptive field support, and close collaboration with construction teams.

Key Contributions:

  • 380,000+ cubic meters of backfill were designed, produced, and placed with precision underground.
  • Multiple custom mix designs were developed to suit different ground conditions, including:
    • Cemented paste backfill
    • Uncemented paste
    • Self-leveling concrete
  • One standout mix design earned the SCA’s "Project of the Year – Innovative Application" award, recognizing the team’s creativity and technical excellence.

Integrated Engineering & Field Support:

  • The T Engineering team led the development of:
    • Tailored backfill mix designs
    • Structural barricade designs
    • Comprehensive backfill methodologies
  • Our staff worked hands-on at the site, conducting quality control using a mobile on-site lab, providing real-time data and adjustments to ensure backfill performance and safety.
  • A tight feedback loop between field personnel and the design team enabled adaptive engineering solutions as conditions evolved.

The Outcome

The project was completed safely, efficiently, and successfully, setting a new standard for underground mine remediation. Not only did the effort achieve its technical and environmental objectives, but it also fostered deep camaraderie and mutual respect among all teams involved.

Acknowledgements

This achievement would not have been possible without the dedication and professionalism of our partners at Nahanni Construction, JDS, True North Surveys, and the hardworking crews on site. What began as an engineering mission transformed into a long-standing collaboration built on trust and excellence.